Full 1
Full 1
Full 1
Full 1
Full 1

Cycleway 9

Cycleway 9 is designed to help support the Mayor of London’s Transport Strategy and Healthy Streets Approach by encouraging walking, cycling, and using public transport.

The changes undertaken by SF-Stefan on Kew Bridge Road, Kew Road and Chiswick High Road include:

  • Constructing a two-way segregated cycle track on Kew Bridge Road and Chiswick High Road
  • Installation of Infrastructure for New signal-controlled pedestrian crossings and updated traffic signals at the Junction of Kew Bridge Road and Kew Road
  • Construction of Stepped cycle tracks (at a lower height than the footway) eastbound stepped track on Kew Bridge Road and Chiswick High Road
  • Changes to bus stop locations and layouts, including new bus stop bypasses for cyclists.
  • Changes to parking and loading bays.

This section of Cycleway 9 provides a continuous, largely segregated route between Kew Bridge Road, Kew Road and Chiswick High Road.

 

C9E Temp Cycle
C9 Kew Bridge
C9 Kew Bridge 2
C9 Kew Bridge 3
C9 Kew Bridge 4
C9 Kew Bridge 5
C9 Kew Bridge 6

Head Office

SF Stefan
Instalcom House, Manor Way, Borehamwood, Hertfordshire
WD6 1QH
info@sf-stefan.co.uk

 

+44 (0)208 204 7829

Keep up to date

facebook